FTS Report on DOY 241 I. The following are clock offsets, in microseconds between the clocks at each DSN complex and each complex relative to UTC(NIST). The offset is a mean of readings using several GPS space vehicles in common view. SPC10 SPC40 SPC60 SPC40 SPC60 MINUS MINUS MINUS MINUS MINUS MJD DOY NIST NIST NIST SPC10 SPC10 55792 231 -0.382 0.506 -1.002 0.886 -0.618 55793 232 -0.391 0.513 -0.985 0.902 -0.593 55794 233 -0.401 0.520 -0.966 0.920 -0.566 55795 234 -0.408 0.526 -0.949 0.932 -0.539 55796 235 -0.417 0.532 -0.932 0.947 -0.513 55797 236 -0.425 0.537 -0.913 0.961 -0.487 55798 237 -0.435 -0.091@ -0.895 0.342@ -0.460 55799 238 -0.442 -0.126 -0.880 0.314 -0.437 55800 239 -0.451 -0.123 -0.863 0.327 -0.411 55801 240 -0.460 -0.117 -0.845 0.341 -0.383 55802 241 -0.468* -0.113* -0.827* 0.355* -0.357* 55803 242 -0.477* -0.108* -0.810* 0.368* -0.331* Values derived from linear least squares extrapolation or interpolation are indicated by (*) next to the time offset. II. Frequency Offsets from linear least-squares fits on time-offsets over the period from 55792 to 55801 ----------------------------------------------------------------------- | | DELTA-F/F | UNCERTAINTY | STD. DEV. | | MEASUREMENT | (E-13) | (+/- E-13) | (nsec.) | |---------------------------------|-----------|-------------|-----------| | SPC10 RELATIVE TO UTC(NIST) | -0.991 | 0.007 | 0.544 | | SPC40 RELATIVE TO UTC(NIST) | 0.527 | 0.009 | 0.722 | | SPC60 RELATIVE TO UTC(NIST) | 2.014 | 0.011 | 0.876 | | SPC40 RELATIVE TO SPC10 | 1.557 | 0.006 | 0.433 | | SPC60 RELATIVE TO SPC10 | 3.015 | 0.013 | 1.035 | ----------------------------------------------------------------------- III. Comments: @Global power outage in SPC40 on DOY 237 0100 to 1300 UTC. This is to allow for an ordered transition from the old power distribution system to the new “busducting” system. The MCAs was started and re-synced to GPS time at 1000 UTC, approximately. The offset was less than -70nS. NOTES: All DSN data are from the new multichannel receivers. SPC 10 and SPC 60 offsets are commonviewed with NIST and with each other. SPC 40 offsets are all-in-viewed with NIST and with SPC 10. FTS Contacts: Connie Dang (626)305-6194 :: Linh La (626)305-6184 Page 1